For Chicago developers
Screen a Chicago lot before the broker calls back.
Paste the PIN and read the district, the envelope, the unit and stall count and the TOD position, every figure cited to Title 17. Decide go, visit or no-go before the architect is free.
Options generated and ranked inside the envelope, each with units and stalls.
- 2.62Mparcels in the Chicago metro
- 255jurisdictions ingested
- 53Chicago districts, cited to Title 17
- 2026-08-24ordinance snapshot
The four questions a developer asks
Answered for a 50 × 125 ft RT-4 lot, with the section beside each number.
-
1What district is it in?
RT-4
Residential Two-Flat, Townhouse 4. The district, lot lines, dimensions and overlays load from county and City records when you paste the PIN; nothing to type.
-
2What is the envelope?
7,500 sf
FAR 1.2 on a 50 × 125 ft lot, 38 ft height limit, setbacks of about 15 ft front and 30 ft rear as working scalars of the contextual formulas.
§17-2-0304-A · §17-2-0311-A · §17-2-0305..0309 -
3How many units and stalls?
6 units · 6 stalls
6,250 sq ft of lot at 1,000 sq ft of lot area per unit gives 6 units by right; one parking space per unit before transit relief.
§17-2-0303-A · §17-10-0207-C -
4Does TOD apply?
Up to 100%
Within 2,640 ft of a CTA rail station entrance the residential parking minimum may be reduced by up to 100% by right outside D districts. RT-4 keeps its base bulk; the bulk bonuses are for B-3 and C-3 districts only, where B3-3 rises from FAR 3 to 4 with 100% of the ARO requirement on site.
§17-10-0102-B.1(a) · §17-3-0403-B
Figures from the RT-4 and B3-3 rows of the ordinance snapshot. Setbacks are contextual formulas; the scalars are working values to confirm per lot. The RT-4 page
From PIN to closing
Four phases, and the one Chicago adds.
-
10 minutes · Development Manager
The ten-minute screen
Paste the PIN, read what the ordinance already says, generate and rank the options, decide go, visit or no-go against the matrix, and send the pre-diligence report.
Fig 2.1 The PIN pasted, the parcel and its district loaded from the records. -
1 hour · with the architect
Frame the brief
Lot and context, zoning of record, your target units and stalls, the option that fits, the flags (stepbacks, ARO trigger, PD threshold, blocked uses, loading) and what still needs a human. The architect starts from a validated envelope, not a blank page.
Fig 2.2 Options ranked inside the envelope; the top three shown, nine explored on this lot. -
30 minutes · the offer
Attach it to the offer
The massing on the actual lot, the programme summary, the compliance checks with citations and the TOD/ARO position go in the LOI package. The seller’s broker sees who did the homework. Nothing in it claims to be a zoning opinion.
Fig 2.3 The options compared on FAR, height, units, parking and TOD bonus. -
4–6 weeks · mostly waiting on the City
Diligence to closing
The diligence pack: the report plus assemblage and scenario studies, survey extraction and supporting public-record documentation. The seven manual-diligence items, and the City’s zoning letter requested early, because the City allows itself up to 30 days.
Fig 2.4 The report, every number carrying its Municipal Code citation.
Chicago only · when a rezoning or PD is in play
The aldermanic read
Aldermanic prerogative makes community input a gating item for rezonings. When the lot needs a map amendment or triggers planned-development review, the community read is its own phase, after the report, not a step every lot walks through.
Decide with a rule, not a feeling
The Go / Visit / No-Go matrix.
The conditions are advice, the citations are facts, and the decision stays yours.
| Criterion | Go | Visit | No-Go |
|---|---|---|---|
| Units vs your target | Within 10% under lot-area-per-unit and FAR | Reachable only with TOD relief or an assemblage | More than 20% short by right |
| Use | Permitted by right in the district | Special use or conditional | Residential blocked (M districts, PMD) |
| Height and FAR headroom | Fits with margin | Fits only at max; stepbacks bite the top floors | Needs a map amendment |
| Parking | Ratio met on site, or TOD reduction applies | Needs a reduction the alderman must support | Cannot be met without losing units |
| Affordable requirement | Under the ARO trigger, or priced in | At the trigger; model on-site vs in-lieu | Not modelled |
| Planned Development | Below PD thresholds | At a threshold; one design change avoids it | Triggers PD review |
| Access | Alley or curb cut present | Alley only; loading unresolved | No legal access |
Impact by role
Three people at the table, one cited answer.
The alternatives
Against doing it by hand, a City zoning letter and TestFit.
| RealDevelop | By hand | City zoning letter | TestFit | |
|---|---|---|---|---|
| Cost | First site free · then $250/mo or $2,400/yr, unlimited parcels | A day of your time per site | $150 filing fee | Listed from $15,000/yr |
| Turnaround | Seconds; the report builds in two or three | About a day; forty sites is a month | Up to 30 days, per the City’s published guidance | — |
| The ordinance, read and cited per figure | Yes, to its Title 17 section | You read the bulk table, overlays and amendments yourself | The City’s position; it does not show its working | — |
| Massing, units and stalls | Options generated and ranked; the top three shown | Not without an architect | No | Yes; automated site plans are its product |
| Accepted at closing | No | No | Yes | No |
| Scales to many sites | Yes | No | No, and it is not meant to | — |
TestFit’s price is as listed on testfit.io/pricing (Site Solver, from $15,000/yr); a dash means we do not describe it beyond its public pages. The City letter figures are from the City’s published guidance; see report vs zoning letter.
Your numbers
What your screening time is worth.
Enter your own figures. Only two are filled in, and both come from this page: a day of your time per site, and the City’s $150 filing fee.
Time and money at stake in the sites you would run through the tool
Enter your sites per month, an hourly cost and a share to see the arithmetic.
0 hours a year
$0 a year
Arithmetic on your inputs. Ten minutes is a demonstrated product time; we publish no customer-measured saving.
What this is not
Not a zoning opinion letter, not an architect’s stamp, not a pro forma, not a build promise. It is a cited desk read of the ordinance and generated options for deciding what to pursue. Confirm before you commit: a desk analysis cannot see recorded easements, prior variations, planned-development ordinances that supersede base zoning, or a map amendment filed last week.
Run the lot you are weighing.
Parcel data is live across the Chicago metro. Paste the PIN or the address.