For Chicago developers

Screen a Chicago lot before the broker calls back.

Paste the PIN and read the district, the envelope, the unit and stall count and the TOD position, every figure cited to Title 17. Decide go, visit or no-go before the architect is free.

Options generated and ranked inside the envelope, each with units and stalls.

The four questions a developer asks

Answered for a 50 × 125 ft RT-4 lot, with the section beside each number.

  1. 1What district is it in?

    RT-4

    Residential Two-Flat, Townhouse 4. The district, lot lines, dimensions and overlays load from county and City records when you paste the PIN; nothing to type.

  2. 2What is the envelope?

    7,500 sf

    FAR 1.2 on a 50 × 125 ft lot, 38 ft height limit, setbacks of about 15 ft front and 30 ft rear as working scalars of the contextual formulas.

    §17-2-0304-A · §17-2-0311-A · §17-2-0305..0309
  3. 3How many units and stalls?

    6 units · 6 stalls

    6,250 sq ft of lot at 1,000 sq ft of lot area per unit gives 6 units by right; one parking space per unit before transit relief.

    §17-2-0303-A · §17-10-0207-C
  4. 4Does TOD apply?

    Up to 100%

    Within 2,640 ft of a CTA rail station entrance the residential parking minimum may be reduced by up to 100% by right outside D districts. RT-4 keeps its base bulk; the bulk bonuses are for B-3 and C-3 districts only, where B3-3 rises from FAR 3 to 4 with 100% of the ARO requirement on site.

    §17-10-0102-B.1(a) · §17-3-0403-B

Figures from the RT-4 and B3-3 rows of the ordinance snapshot. Setbacks are contextual formulas; the scalars are working values to confirm per lot. The RT-4 page

From PIN to closing

Four phases, and the one Chicago adds.

  1. 10 minutes · Development Manager

    The ten-minute screen

    Paste the PIN, read what the ordinance already says, generate and rank the options, decide go, visit or no-go against the matrix, and send the pre-diligence report.

    Read the ten-minute screen

    Fig 2.1 The PIN pasted, the parcel and its district loaded from the records.
  2. 1 hour · with the architect

    Frame the brief

    Lot and context, zoning of record, your target units and stalls, the option that fits, the flags (stepbacks, ARO trigger, PD threshold, blocked uses, loading) and what still needs a human. The architect starts from a validated envelope, not a blank page.

    Fig 2.2 Options ranked inside the envelope; the top three shown, nine explored on this lot.
  3. 30 minutes · the offer

    Attach it to the offer

    The massing on the actual lot, the programme summary, the compliance checks with citations and the TOD/ARO position go in the LOI package. The seller’s broker sees who did the homework. Nothing in it claims to be a zoning opinion.

    Fig 2.3 The options compared on FAR, height, units, parking and TOD bonus.
  4. 4–6 weeks · mostly waiting on the City

    Diligence to closing

    The diligence pack: the report plus assemblage and scenario studies, survey extraction and supporting public-record documentation. The seven manual-diligence items, and the City’s zoning letter requested early, because the City allows itself up to 30 days.

    Report vs zoning letter

    Fig 2.4 The report, every number carrying its Municipal Code citation.

Chicago only · when a rezoning or PD is in play

The aldermanic read

Aldermanic prerogative makes community input a gating item for rezonings. When the lot needs a map amendment or triggers planned-development review, the community read is its own phase, after the report, not a step every lot walks through.

Decide with a rule, not a feeling

The Go / Visit / No-Go matrix.

The conditions are advice, the citations are facts, and the decision stays yours.

CriterionGoVisitNo-Go
Units vs your targetWithin 10% under lot-area-per-unit and FARReachable only with TOD relief or an assemblageMore than 20% short by right
UsePermitted by right in the districtSpecial use or conditionalResidential blocked (M districts, PMD)
Height and FAR headroomFits with marginFits only at max; stepbacks bite the top floorsNeeds a map amendment
ParkingRatio met on site, or TOD reduction appliesNeeds a reduction the alderman must supportCannot be met without losing units
Affordable requirementUnder the ARO trigger, or priced inAt the trigger; model on-site vs in-lieuNot modelled
Planned DevelopmentBelow PD thresholdsAt a threshold; one design change avoids itTriggers PD review
AccessAlley or curb cut presentAlley only; loading unresolvedNo legal access

Impact by role

Three people at the table, one cited answer.

RoleThe painWhat changes
Principal / Acquisitions More lots on the table than diligence budget to spend on them. A cited read and ranked options on every candidate, so real diligence money goes to the two or three sites that survive.
Development Manager The broker wants an answer Friday; the architect can look at it in two weeks. A ten-minute screen with the ordinance already read, then a brief for the architect from a validated envelope.
Lender A sponsor’s density and height assumptions, with nothing beside them to check. Each figure next to the Title 17 section that sets it, and the manual-diligence list that says what a desk read cannot see.

The alternatives

Against doing it by hand, a City zoning letter and TestFit.

RealDevelopBy handCity zoning letterTestFit
Cost First site free · then $250/mo or $2,400/yr, unlimited parcelsA day of your time per site$150 filing feeListed from $15,000/yr
Turnaround Seconds; the report builds in two or threeAbout a day; forty sites is a monthUp to 30 days, per the City’s published guidance—
The ordinance, read and cited per figure Yes, to its Title 17 sectionYou read the bulk table, overlays and amendments yourselfThe City’s position; it does not show its working—
Massing, units and stalls Options generated and ranked; the top three shownNot without an architectNoYes; automated site plans are its product
Accepted at closing NoNoYesNo
Scales to many sites YesNoNo, and it is not meant to—

TestFit’s price is as listed on testfit.io/pricing (Site Solver, from $15,000/yr); a dash means we do not describe it beyond its public pages. The City letter figures are from the City’s published guidance; see report vs zoning letter.

Your numbers

What your screening time is worth.

Enter your own figures. Only two are filled in, and both come from this page: a day of your time per site, and the City’s $150 filing fee.

Time and money at stake in the sites you would run through the tool

Enter your sites per month, an hourly cost and a share to see the arithmetic.

Arithmetic on your inputs. Ten minutes is a demonstrated product time; we publish no customer-measured saving.

What this is not

Not a zoning opinion letter, not an architect’s stamp, not a pro forma, not a build promise. It is a cited desk read of the ordinance and generated options for deciding what to pursue. Confirm before you commit: a desk analysis cannot see recorded easements, prior variations, planned-development ordinances that supersede base zoning, or a map amendment filed last week.

When your deal needs the City’s letter instead

Pricing

Free
Your first site, on a call, including a deal you recently lost
Pro
$200 per month billed yearly, or $250 monthly; unlimited parcels
Teams
Volume and white-label for brokerages and lenders, invoiced

Compare plans

Or email team@realdevelop.io with the lot you are weighing.

Run the lot you are weighing.

Parcel data is live across the Chicago metro. Paste the PIN or the address.