Guide · Chicago
Brief your architect from the envelope
What to hand the architect after a go: the lot, the district, the envelope figures, the option and its metrics, the flags, and the manual-diligence list.
A go is the start of the deal, not the end of the work. The architect should begin from a validated envelope, not a blank page. This guide lists what to hand over, what the report contains, what it leaves to a human and how to use the hour.
1 · What to hand the architect
- The lot and its context: address, PIN, lot area, frontage and depth, and the districts on each side.
- The zoning of record: the district and its bulk standards, each with its Title 17 section.
- Your targets: units and stalls you need.
- The option that fits: the one you chose, with its metrics: units, stories, floor area and stalls.
- The flags: stepbacks, ARO trigger, PD threshold, blocked uses and loading.
- What still needs a human: the manual-diligence list below.
Today the handover is the exported PDF report plus the option’s metrics. There is no architect share link or architect export yet, so send the PDF and the figures, not a link.
2 · What the report contains
The report assembles six sections. The parcel: address, PIN, lot area, frontage and depth, ward and assessor class. Base zoning, and what is next door: the district plus the districts on each side, because Chicago setbacks are contextual. Bulk standards, cited field by field: FAR, height, minimum lot area, lot area per unit, setbacks and parking, each with its section. Connected Communities / TOD: whether the parcel is transit-served, which tier, and the parking, FAR and density factors that follow. Overlays and special districts: flood zones, planned developments, ARO areas, landmarks and historic districts, each a hit or a miss. The manual-diligence checklist.
3 · The manual-diligence list
The things no API can answer, each with the office to ask: the zoning verification letter, FOIAs for variances and special uses, FOIAs for open fire-code and zoning-code violations, Certificate of Occupancy copies, site plan approval conditions, and records requests. Hand the architect this list with the report so nobody assumes the desk read has already settled them.
4 · What the pre-diligence report is, and is not
It is the cited read plus the option you chose, as a PDF for a partner or lender before diligence money is spent. It is not a PZR-grade zoning report and not an architect’s brief. Not a zoning opinion letter, not an architect’s stamp, not a pro forma.
A desk analysis cannot see recorded easements, prior variations and administrative adjustments, planned-development ordinances that supersede base zoning, or a map amendment filed last week. When the deal needs the City’s own position, the zoning verification letter is requested from Room 905 at 121 N LaSalle St, carries a $150 filing fee and takes up to 30 days.
5 · The hour with the architect
Frame the brief in about an hour: lot and context, zoning of record, your target units and stalls, the option that fits, the flags, and what still needs a human. The architect confirms the setbacks per edge, resolves access and loading, and takes the figure from a desk read to a drawing that can be reviewed. Then attach the massing, the programme summary and the compliance checks with citations to the offer, which takes about 30 minutes.
Read the ten-minute lot screen · The developers page
Questions about the handover
Is the report an architect’s brief?
No. It is a pre-diligence report: the cited read plus the option you chose, as a PDF for a partner or lender before diligence money is spent. It is not a PZR-grade zoning report and not an architect’s brief. It gives the architect a validated envelope to start from.
Does it replace a zoning letter?
No. A zoning verification letter is issued by the municipality itself and is the City’s own statement about the parcel, the document a lender or title company will accept at closing. A zoning report is an independent analysis. Reports are for deciding whether to pursue a site; the letter is for closing on it.
What can a desk read not see?
Recorded easements, prior variations and administrative adjustments, planned-development ordinances that supersede base zoning, or a map amendment filed last week. Every report ends with a checklist of the manual-diligence items that only a human request can settle.
What does the architect still have to do?
Take the envelope to a drawing. The report gives the architect the lot, the zoning of record, the option that fits and the flags, and says what still needs a human. Setback confirmation per edge, access and loading, and anything the checklist leaves to a records request remain the architect’s and your own work.